Detailed geological mapping and active fault identification of footprint Tigadihaji dam
Seismic hazard assesment at Buttu Batu dam
Seismic hazard assesment at Mangabung tailing dam, Sumbawa
Structural dynamics analysis by 3D seismic software of Batang Toru Dam
Structural dynamic analysis by 3D seismic software of Headrace Tunnel, Surge Tank, Penstock and Power House of Batang Toru HEPP
Structural dynamics analysis at Mangabung tailing dam
Field Identification of Active Fault of Batang Toru Power House
Seismic hazard assesment at Batang Toru dam
Seismic hazard assesment at Tigadihadji dam
Dynamic Analysis of Dam and Appurtenant Works of Tigadihaji dam (Analisis Dinamis dari Bendungan Tigadihadji dan Bangunan Pelengkapnya)
(Identifikasi dan Asesmen Resiko Seismik di Bendungan Sadawarna)
(Analisis Dinamis Bendungan Sadawarna dengan Beban Gempa)
(Desain Pondasi Bendungan Sadawarna)
(Desain Bahan Timbunan Bendungan Sadawarna)
(Analisis dan Asesmen Resiko Seismik di Bendungan Jenelata)
(Analisis Deformasi Permukaan Jalan Tol Cibitung-Cilincing STA 4+000 - STA 8+300 dan Analisa Deformasi Jalur Pipa Gas di dalam ROW Jalan Tol Cibitung-Cilincing STA 7+700 - 7+950)
(Analisis Stabilitas Perkuatan Timbunan Ramp 4 Serpong Junction STA 4+300 – 4+500 dengan Sheet Pile Beton)
Carbon samples for carbon dating test
Fault Identification
Geological outcrop study
Paleoseisomogical Treching
Carbon Sampling
Field camp for advanced electrical resistivity testing
Investigation trench inspection
On-site team deployment
Trenching for carbon dating test
Multi Channel Resistivity test using Supersting R8IP