Banyu Biru Solusi Geoteknik
  • Home
  • ABOUT US
  • OUR SERVICES
  • PORTFOLIO
  • CONTACT US

Portfolio

Selected Past works:

  • Detailed geological mapping and active fault identification of footprint Tigadihaji dam
  • Seismic hazard assesment at Buttu Batu dam
  • Seismic hazard assesment at Mangabung tailing dam, Sumbawa
  • Structural dynamics analysis by 3D seismic software of Batang Toru Dam
  • Structural dynamic analysis by 3D seismic software of Headrace Tunnel, Surge Tank, Penstock and Power House of Batang Toru HEPP
  • Structural dynamics analysis at Mangabung tailing dam
  • Field Identification of Active Fault of Batang Toru Power House
  • Seismic hazard assesment at Batang Toru dam
  • Seismic hazard assesment at Tigadihadji dam
  • Dynamic Analysis of Dam and Appurtenant Works of Tigadihaji dam (Analisis Dinamis dari Bendungan Tigadihadji dan Bangunan Pelengkapnya)
  • (Identifikasi dan Asesmen Resiko Seismik di Bendungan Sadawarna)
  • (Analisis Dinamis Bendungan Sadawarna dengan Beban Gempa)
  • (Desain Pondasi Bendungan Sadawarna)
  • (Desain Bahan Timbunan Bendungan Sadawarna)
  • (Analisis dan Asesmen Resiko Seismik di Bendungan Jenelata)
  • (Analisis Deformasi Permukaan Jalan Tol Cibitung-Cilincing STA 4+000 - STA 8+300 dan Analisa Deformasi Jalur Pipa Gas di dalam ROW Jalan Tol Cibitung-Cilincing STA 7+700 - 7+950)
  • (Analisis Stabilitas Perkuatan Timbunan Ramp 4 Serpong Junction  STA 4+300 – 4+500 dengan Sheet Pile Beton)
Picture
Carbon samples for carbon dating test
Picture
Fault Identification
Picture
Geological outcrop study
Picture
Paleoseisomogical Treching
Picture
Carbon Sampling
Picture
Field camp for advanced electrical resistivity testing
Picture
Investigation trench inspection
Picture
On-site team deployment
Picture
​Trenching for carbon dating test
Picture
Multi Channel Resistivity test using Supersting R8IP
Let's start your project today
© PT. Banyu Biru Solusi Geoteknik
  • Home
  • ABOUT US
  • OUR SERVICES
  • PORTFOLIO
  • CONTACT US